An Extensive 1000m² extension to the existing hospital incorporating a new day surgery ward, meeting and staffroom, kitchen, a third theatre and numerous areas required for the running of a hospital.

The existing theatres and associated areas were completely refitted with a new recovery area and amenities area created. This was all carried out whilst the hospital was in full operation.

Construction of the extension consisted of on ground and suspended concrete floors with pre cast wall panels and structural steel. Second level plant rooms were created in two areas to accommodate the extensive mechanical plant for the air conditioning. A separate area was also built away from the main building to house the heating and cooling units.

A coloursteel roof and double glazed aluminium windows completed the main structure of the building.